PROJECTS SPONSOR |
PROJECT NAME |
PROJECT NUMBER |
FIND GRANT AMOUNT |
TOTAL PROJECT COST |
Miami-Dade County |
Pelican Island Dock Replacement |
DA-16-210 |
$123,000.00 |
$246,000.00 |
Miami-Dade County |
Matheson Marina Floating Dock Renovation, Park 2 |
DA-16-211 |
$526,300.00 |
$1,052,600.00 |
Miami-Dade County |
Homestead Bayfront Marina Boat Ramp Piers, PH I |
DA-16-209 |
$75,000.00 |
$150,000.00 |
Miami-Dade County |
Crandon Marina Floating Dock Renovation, Part 2 |
DA-16-208 |
$555,410.00 |
$1,100,820.00 |
City of Miami Beach |
North Beach Kayak Launch Dock |
DA-MB-16-207 |
$142,007.00 |
$284,014.00 |
City of Miami Beach |
Indian Creek Shoreline Improvements and Greenway |
DA-MB-16-206 |
$1,000,000.00 |
$5,000,000.00 |
City of Miami |
Virginia Key Boat Launch and Trailer Parking, PH I |
DA-MI-16-205 |
$60,500.00 |
$121,000.00 |
City of Miami |
Seybold Canal and Wagner Creek Dredging |
DA-MI-16-204 |
$1,200,000.00 |
$2,400,000.00 |
City of Miami |
Seawall and Baywalk at NE 22nd St and 22nd Terr., PH I |
DA-MI-16-203 |
$31,000.00 |
$62,000.00 |
City of Miami |
Morningside Floating Docks, PH I |
DA-MI-16-202 |
$16,500.00 |
$33,000.00 |
City of Miami |
Mooring Facility off Watson Island, PH I |
DA-MI-16-201 |
$75,000.00 |
$150,000.00 |
City of Miami |
Miami Woman's Club Baywalk, PH II |
DA-MI-16-200 |
$245,000.00 |
$490,000.00 |
City of Miami |
Miami Marine Stadium In-Water Structure Assessment, PH |
DA-MI-16-199 |
$250,000.00 |
$500,000.00 |
City of Miami |
Dinner Key Marina Mooring Facility, PH I |
DA-MI-16-198 |
$75,000.00 |
$150,000.00 |
Village of Palmetto Bay |
Thalatta Shoreline Stabilization and Pier, PH I |
DA-PB-16-197 |
$50,000.00 |
$100,000.00 |
North Bay Village |
North Bay Village Boardwalk, PH I |
DA-NBV-16-196 |
$100,000.00 |
$200,000.00 |
City of Miami Beach |
Maurice Gibb Memorial Park Dock & Launch - Phase I |
DA-MB-15-195 |
$75,000.00 |
$150,000.00 |
North Bay Village |
Baywalk Plaza - Phase IIA |
DA-NBV-15-194 |
$200,000.00 |
$400,000.00 |
Miami-Dade County |
Homestead Bayfront Marina Wet Slip Renovations |
DA-15-193 |
$205,000.00 |
$410,000.00 |
Miami-Dade County |
Crandon Floating Dock Renovations |
DA-15-192 |
$389,381.00 |
$778,763.00 |
Miami-Dade County |
Matheson Hammock Marina Boat Ramps |
DA-15-191 |
$283,059.00 |
$566,118.00 |
Miami-Dade County |
Matheson Hammock Marina Wetslip Renovations |
DA-15-190 |
$104,699.00 |
$209,399.00 |
Miami-Dade County |
Crandon Marina Boat Ramps |
DA-15-189 |
$215,266.00 |
$430,531.00 |
City of Miami |
Legion Park Seawall & Boat Ramp - Phase I |
DA-MI-15-188 |
$50,000.00 |
$100,000.00 |
City of Miami |
Bayside Wharf at Miamarina - Phase I |
DA-MI-15-187 |
$50,000.00 |
$100,000.00 |
City of Miami |
Alice Wainwright Park Seawall Baywalk Ph I |
DA-MI-15-186 |
$62,500.00 |
$125,000.00 |
City of Miami |
Dinner Key Marina Pumpout Upgrade |
DA-MI-15-185 |
$150,000.00 |
$500,000.00 |
City of Miami |
Morningside Park Seawall & Boat Launch - Phase I |
DA-MI-15-184 |
$25,000.00 |
$50,000.00 |
City of Miami |
Marine Stadium Baywalk - Phase II |
DA-MI-15-183 |
$500,000.00 |
$1,000,000.00 |
City of Miami |
Miamarina Upgrade of Electrical System |
DA-MI-15-182 |
$375,000.00 |
$750,000.00 |
City of Miami |
Derelict Vessel Removal - City of Miami |
DA-MI-15-181 |
$30,000.00 |
$60,000.00 |
City of Miami |
Spring Garden Park Seawall & Kayak - Phase I |
DA-MI-15-180 |
$75,000.00 |
$150,000.00 |
City of Miami |
Baywalk Southside FEC Slip - Phase II |
DA-MI-15-179 |
$1,250,000.00 |
$2,500,000.00 |
City of Miami |
Seybold Canal & Wagner Creek Dredging - Phase E |
DA-MI-15-178 |
$700,000.00 |
$1,400,000.00 |
City of Miami |
Baywood Park Seawall - Phase I (Withdrawn) |
DA-MI-15-177 |
$25,000.00 |
$50,000.00 |
City of Miami |
Pallot Park Seawall, Baywalk & Kayak - Phase II |
DA-MI-15-176 |
$150,000.00 |
$300,000.00 |
City of Miami |
Miami Marina Park Wet Slips & Mooring - Phase I |
DA-MI-15-175 |
$50,000.00 |
$100,000.00 |
Town of Surfside |
Surfside Seawall Replacement - Part 2 |
DA-SU-15-174 |
$346,250.00 |
$692,500.00 |
Miami-Dade County |
Matheson Marina Floating Dock Renovations |
DA-14-173 |
$239,259.00 |
$478,518.00 |
Miami-Dade County |
Pelican Marina Boat Ramp Renovation - Phase I |
DA-14-172 |
$60,000.00 |
$167,000.00 |
Miami-Dade County |
Pelican Island Day Dock Replacement - Phase I |
DA-14-171 |
$37,296.00 |
$74,592.00 |
Miami-Dade County |
Pelican Marina Wet Slips Frameworks Repl. |
DA-14-170 |
$256,470.00 |
$512,940.00 |
Miami-Dade County |
Black Point Marina Wetslips Frames Repl. |
DA-14-169 |
$349,170.00 |
$698,340.00 |
City of Miami Beach |
Indian Creek Park Seawall Construction |
DA-MB-14-168 |
$692,501.50 |
$1,385,003.00 |
City of Miami Beach |
Normandy Shores Park Seawall |
DA-MB-14-167 |
$225,478.00 |
$450,956.00 |
City of Miami |
Virginia Key Beach Park Education Signs |
DA-MI-14-166 |
$9,400.00 |
$18,800.00 |
City of Miami |
Virginia Key Beach Park Tiki Village |
DA-MI-14-165 |
$16,930.00 |
$33,860.00 |
City of Miami |
Baywalk Floating Dock Regatta Park - Phase I |
DA-MI-14-164 |
$20,000.00 |
$40,000.00 |
City of Miami |
Dinner Key Marina Dinghy Dock - Phase II |
DA-MI-14-163 |
$75,000.00 |
$150,000.00 |
City of Miami |
Seybold Canal & Wagner Creek Dredging - Phase D |
DA-MI-14-162 |
$1,000,000.00 |
$2,000,000.00 |
Town Of Surfside |
Surfside Seawall Replacement |
DA-SU-13-149 |
$494,445.00 |
$988,890.00 |
Miami- Dade County |
Miami River Greenway Sites 4 & 5 |
DA-13-161 |
$500,000.00 |
$1,024,025.00 |
Miami- Dade County |
Matheson Hammock Marina Boat Ramp Renovations Phase I |
DA-13-160 |
$75,000.00 |
$177,000.00 |
Miami- Dade County |
Crandon Marina Boat Ramp Renovations - Phase I |
DA-13-159 |
$70,000.00 |
$169,500.00 |
City Of North Miami |
N. Bayshore William Lehman Park Fishing & Pier Restore |
DA-NM-13-148 |
$300,000.00 |
$630,000.00 |
City Of Miami Beach |
Parks Blueways Master Plan |
DA-MB-13-158 |
$40,000.00 |
$80,000.00 |
City Of Miami Beach |
Indian Creek Park Seawall - Phase I |
DA-MB-13-157 |
$160,000.00 |
$320,000.00 |
City Of Miami |
Manatee Bend Park Seawall & Floating Dock - Phase I I |
DA-MI-13-156 |
$325,000.00 |
$650,000.00 |
City Of Miami |
Lummus Landing Riverwalk And Dock |
DA-MI-13-155 |
$570,000.00 |
$1,140,000.00 |
City Of Miami |
Curtis Park Boat Ramp Repair & Reconstruction Phase II |
DA-MI-13-154 |
$190,050.00 |
$380,100.00 |
City Of Miami |
Virginia Key Nature Center Seawall&kayak Launch - Ph I |
DA-MI-13-153 |
$37,500.00 |
$75,000.00 |
City Of Miami |
Seybold Canal & Wagner Creek Dredging Phase C (Expired) |
DA-MI-13-152 |
$1,000,000.00 |
$2,000,000.00 |
City Of Miami |
Miami Women's Club Baywalk - Phase 2 (Withdrawn) |
DA-MI-13-151 |
$150,000.00 |
$300,000.00 |
City Of Miami |
Miami Marine Stadium In-water Asses. Ph I (Withdrawn) |
DA-MI-13-150 |
$157,900.00 |
$315,800.00 |
City Of North Bay Village |
Vogel Park Improvements |
DA-NBV-12-147 |
$110,167.00 |
$220,335.00 |
City Of North Bay Village |
Baywalk Plaza Area - Phase I |
DA-NBV-12-146 |
$50,250.00 |
$100,500.00 |
Miami- Dade County |
Vizcaya Public Shoreline Stabilization N.E. Garden Area |
DA-12-145 |
$77,431.58 |
$154,863.16 |
Miami- Dade County |
Pelican Harbor Marina Improvements |
DA-12-144 |
$1,200,000.00 |
$2,400,000.00 |
Miami- Dade County |
Miami River Greenway Riverwalk |
DA-12-143 |
$500,000.00 |
$1,134,297.00 |
City Of Miami Beach |
South Pointe Pier Construction - Phase I I |
DA-MB-12-142 |
$986,000.00 |
$4,098,381.00 |
City Of Miami |
Spoil Island E Floating Dock Restoration - Phase I I |
DA-MI-12-141 |
$57,500.00 |
$115,000.00 |
City Of Miami |
Seybold Canal & Wagner Creek Dredging-PH B (Expired) |
DA-MI-12-140 |
$700,000.00 |
$1,400,000.00 |
City Of Miami |
Pallot Park Shoreline Stab. - PH 1 (Withdrawn) |
DA-MI-12-139 |
$30,000.00 |
$60,000.00 |
City Of Miami |
Marine Stadium Marina Seawall Replacement - Phase I I |
DA-MI-12-138 |
$785,000.00 |
$1,570,000.00 |
City Of Miami |
Manatee Bend Park Seawall Improv.-PH I (Withdrawn) |
DA-MI-12-137 |
$38,500.00 |
$77,000.00 |
City Of Miami |
Little River Waterfront Acq. - Phase B (Expired) |
DA-MI-12-136 |
$183,750.00 |
$735,000.00 |
Bal Harbour Village |
Sand Bypass-Bakers Haulover Inlet - PH I (Withdrawn) |
DA-BH-12-135 |
$50,000.00 |
$400,000.00 |
Miami- Dade County |
Vizcaya Public Shoreline Stabilization - Phase I |
DA-11-134 |
$41,000.00 |
$84,500.00 |
Miami- Dade County |
Miami Marine Stadium Park Shoreline Stabilization |
DA-11-133 |
$400,000.00 |
$800,000.00 |
Miami- Dade County |
Dinner Key Spoil Islands B & C Shoreline Stabilization |
DA-11-132 |
$300,000.00 |
$600,000.00 |
City Of Miami Beach |
Biscayne Bay 10th Street-end Park & Seawall |
DA-MB-11-131 |
$472,820.00 |
$945,640.00 |
City Of Miami |
Seybold Canal & Wagner Creek Dredging ( Expired) |
DA-MI-11-130 |
$1,000,000.00 |
$22,000,000.00 |
City Of Miami |
Marine Stadium Marina At Virginia Key - Ph I ( Expired) |
DA-MI-11-129 |
$800,000.00 |
$1,600,000.00 |
City Of Miami |
Little River Waterfront Park |
DA-MI-11-128 |
$117,500.00 |
$470,000.00 |
City Of Miami |
Kennedy Park Shoreline Stabilization & Restoration |
DA-MI-11-127 |
$75,000.00 |
$150,000.00 |
City Of Miami |
Kennedy Park Floating Dock Construction & Restoration |
DA-MI-11-126 |
$60,000.00 |
$120,000.00 |
City Of Miami |
Baywalk At Bicentennial Park |
DA-MI-11-125 |
$1,143,000.00 |
$2,286,000.00 |
Town Of Golden Beach |
The Strand Park Boat Dock |
DA-GB-11-124 |
$29,735.00 |
$78,664.00 |
City Of North Bay Village |
Paul Vogel Park Seawall & Dock Repl. - Ph I ( Expired) |
DA-NBV-10-123 |
$55,000.00 |
$110,000.00 |
Miami- Dade County |
Pelican Harbor Marina Elec., Water & Fire Systems- Ph I |
DA-10-122 |
$56,000.00 |
$112,000.00 |
Miami- Dade County |
Crandon Marina Seawall #2 Replacement |
DA-10-121 |
$1,342,932.00 |
$2,685,865.00 |
City Of Miami |
Spoil Island E Restoration & Floating Dock - Phase I |
DA-MI-10-120 |
$15,000.00 |
$30,000.00 |
City Of Miami |
Miami Women's Club Baywalk - Phase I (Expired) |
DA-MI-10-119 |
$46,500.00 |
$93,000.00 |
City Of Miami |
Miami Marine Stadium Restoration - Phase I ( Expired) |
DA-MI-10-118 |
$175,000.00 |
$350,000.00 |
City Of Miami |
Citywide Derelict Vessel Removal |
DA-MI-10-117 |
$20,000.00 |
$45,000.00 |
Miami- Dade County |
R. Hardy Matheson Preserve Shoreline Stabilization |
DA-09-116 |
$550,000.00 |
$1,100,000.00 |
Miami- Dade County |
Fire Rescue Floating Dock & Boat Lift |
DA-09-115 |
$111,150.00 |
$273,882.50 |
Miami- Dade County |
Crandon Marina Seawall Restoration |
DA-09-114 |
$597,633.00 |
$1,195,266.00 |
City Of Miami Beach |
Pine Tree Park Shoreline Improvements |
DA-MB-09-113 |
$74,766.00 |
$248,090.00 |
City Of Miami |
Marine Stadium Marina Seawall Replacement - Phase I |
DA-MI-09-112 |
$17,500.00 |
$35,000.00 |
City Of Miami |
Kennedy Park Shoreline Stabilization - Phase I |
DA-MI-09-111 |
$40,000.00 |
$80,000.00 |
City Of Miami |
Kennedy Park Floating Dock - Phase I |
DA-MI-09-110 |
$17,500.00 |
$35,000.00 |
City Of Miami |
James L. Knight Center Riverwalk - Ph I I ( Withdrawn) |
DA-MI-09-109 |
$30,000.00 |
$60,000.00 |
City Of Miami |
Coconut Grove Public Piers - Phase I ( Withdrawn) |
DA-MI-09-108 |
$144,000.00 |
$288,000.00 |
City Of Miami |
Bicentennial Park Mooring Bollards Construction |
DA-MI-09-107 |
$513,255.00 |
$1,026,510.00 |
Miami- Dade County |
Pelican Harbor Marina Restrooms & Boater Amenities |
DA-08-106 |
$493,716.00 |
$987,433.00 |
City Of Miami Beach |
South Pointe Park Pier Renovation & Expansion - Phase I |
DA-MB-08-105 |
$323,075.00 |
$969,230.00 |
City Of Miami |
Miamarina Seawall Replacement - Phase I |
DA-MI-08-104 |
$40,000.00 |
$80,000.00 |
City Of Miami |
Bicentennial Park Mooring Bollards Design - Phase I |
DA-MI-08-103 |
$42,450.00 |
$84,900.00 |
Miami- Dade County |
Parcel B Public Shoreline Stabilization - Stage 2 |
DA-07-102 |
$2,000,000.00 |
$4,200,000.00 |
City Of Miami |
Construction Of Sewell Park Kayak Launch - Phase I I |
DA-MI-07-101 |
$37,625.00 |
$75,250.00 |
City Of Miami |
Dinner Key Mooring Field Dredging - Phase I I |
DA-MI-07-100 |
$390,000.00 |
$800,000.00 |
Miami- Dade County |
Parcel B Public Shoreline Stabilization |
DA-06-97 |
$178,596.00 |
$372,075.00 |
City Of Miami |
Bicentennial Park Shoreline Stab. - Phase I I I - C |
DA-MI-06-93 |
$1,000,000.00 |
$2,000,000.00 |
Miami- Dade County |
Pelican Harbor Marina Boaters' Complex - Phase I I |
DA-06-98 |
$111,000.00 |
$222,000.00 |
Miami- Dade County |
Homestead Bayfront Marina Complex - Phase I ( Expired) |
DA-06-96 |
$130,000.00 |
$260,000.00 |
City Of North Miami Beach |
Maule Lake Derelict Vessel Removal |
DA-NMB-06-99 |
$40,000.00 |
$85,000.00 |
City Of Miami |
Sewell Park Kayak Launch - Phase I |
DA-MI-06-95 |
$8,500.00 |
$17,000.00 |
City Of Miami |
Dinner Key Mooring Field Project - Phase I I |
DA-MI-06-94 |
$424,745.00 |
$841,500.00 |
Miami- Dade County |
Homestead Bayfront Channel Markers Relocation |
DA-05-92 |
$56,150.00 |
$112,300.00 |
Miami- Dade County |
Haulover Marina Dredging, Seawall, Dock & Wetslips |
DA-05-91 |
$1,135,000.00 |
$4,882,000.00 |
City Of Miami |
Seminole Public Dinghy Dock Replacement |
DA-MI-05-90 |
$28,350.00 |
$62,700.00 |
City Of Miami |
Dinner Key Spoil Island Enhancement |
DA-MI-05-89 |
$425,000.00 |
$850,000.00 |
City Of Miami |
Bicentennial Park Shoreline Stabilization - Phase I I I |
DA-MI-05-88 |
$1,000,000.00 |
$2,000,000.00 |
Town Of Bay Harbor Islands |
Waterfront Park |
DA-BHI-05-87 |
$92,000.00 |
$184,000.00 |
City Of Miami |
Bicentennial Park Shoreline Stabilization - Phase I I |
DA-MI-04-83 |
$419,670.00 |
$2,398,000.00 |
City Of Miami Beach |
Citywide Seawalls Project - Phase I I |
DA-MB-04-85 |
$293,562.00 |
$636,626.00 |
City Of Miami |
Derelict Vessel Removal |
DA-MI-04-84 |
$50,000.00 |
$100,000.00 |
Miami- Dade County |
Haulover Marina Breakwater Completion |
DA-04-86 |
$1,134,243.00 |
$4,112,392.00 |
Miami- Dade County |
Spring Garden Point Park Shoreline Enhancement |
DA-03-82 |
$138,000.00 |
$370,000.00 |
Miami- Dade County |
Haulover Marina Dockmaster Complex- P H I ( Withdrawn) |
DA-03-81 |
$87,000.00 |
$174,000.00 |
City Of Miami |
Dinner Key Mooring & Anchorage Field Project - Phase I |
DA-MI-03-79 |
$32,500.00 |
$100,000.00 |
City Of Miami |
Bicentennial Park Shoreline Stabilization - Stage I |
DA-MI-03-78 |
$700,000.00 |
$1,400,000.00 |
Miami- Dade County |
Pelican Harbor Marina Mooring Field-ph I ( Withdrawn) |
DA-02-77 |
$25,000.00 |
$50,000.00 |
Miami- Dade County |
Pelican Harbor Fishing Pier Repl. - P H I ( Withdrawn) |
DA-02-76 |
$18,000.00 |
$36,000.00 |
Miami- Dade County |
Homestead Bayfront Marina Navigational Impr. - Phase I |
DA-02-75 |
$50,000.00 |
$100,000.00 |
Miami- Dade County |
Crandon Park Marina Dockmaster's Complex - Phase I |
DA-02-74 |
$75,000.00 |
$150,000.00 |
Miami- Dade County |
Black Point & Homestead Bayfront Marinas Piling Repl. |
DA-02-73 |
$125,000.00 |
$250,000.00 |
Miami- Dade County |
Miami River Dredging Project - Stage I I |
DA-02-72 |
$300,000.00 |
$6,000,000.00 |
City Of Miami Beach |
Citywide Seawalls - Phase I |
DA-MB-02-71 |
$135,000.00 |
$270,720.00 |
City Of Miami |
Int. Watersports Center - Public Baywalk Overlook |
DA-MI-02-70 |
$200,371.00 |
$486,500.00 |
Miami- Dade County |
Spoil Island #3 Enhancement Project |
DA-01-68 |
$105,000.00 |
$210,000.00 |
Miami- Dade County |
Haulover Park Marina Renovations |
DA-01-67 |
$1,400,000.00 |
$2,800,000.00 |
Miami- Dade County |
Crandon Park Marina Pier Renovations - Phase I I |
DA-01-66 |
$403,129.00 |
$878,271.00 |
City Of Miami |
Legion Park Waterfront Enhancement Project |
DA-MI-01-65 |
$90,000.00 |
$180,000.00 |
Indian Creek Village |
Marine Patrol Vessel |
DA-ICV-01-64 |
$18,880.00 |
$37,760.00 |
City Of North Bay Village |
Marine Patrol Boat |
DA-NBV-00-63 |
$50,406.00 |
$67,208.00 |
Miami - Dade County |
Flagler Memorial Island Enhancements - Phase I I |
DA-00-61 |
$42,500.00 |
$102,500.00 |
City Of Miami |
Derelict Vessel Removal |
DA-MI-00-60 |
$34,137.00 |
$68,275.00 |
City Of Miami |
Watson Island Boat Ramp Replacement |
DA-MI-00-59 |
$150,000.00 |
$300,000.00 |
Sunny Isles Beach Police Department |
Boating Safety & Environmental Education Program |
DA-SI-99-58 |
$45,603.06 |
$60,804.08 |
City Of Miami |
Kenneth Myers Park/ Seminole Boat Ramp |
DA-MI-99-57 |
$180,000.00 |
$488,333.00 |
City Of Miami |
Margaret Pace Park Public Waterfront Enhancement |
DA-MI-99-56 |
$196,085.00 |
$392,170.00 |
City Of North Miami |
William Lehman Park Fishing & Viewing Piers - Phase I I |
DA-NM-99-55 |
$33,475.00 |
$66,950.00 |
Miami - Dade County |
Spoil Islands #9 & #10 Enhancements |
DA-99-54 |
$135,000.00 |
$316,265.00 |
Miami - Dade County |
Haulover Marina Boat Ramp Renovations |
DA-99-53 |
$183,750.00 |
$367,500.00 |
Miami - Dade County |
Haulover Marina Expansion Designs |
DA-99-52 |
$148,250.00 |
$296,500.00 |
City Of Miami |
Watson Island Boat Ramp Repairs |
DA-MI-98-51 |
$142,000.00 |
$357,687.00 |
City Of North Miami |
William Lehman Park Fishing & Viewing Piers - Phase I |
DA-NM-98-50 |
$15,734.00 |
$31,469.00 |
Miami - Dade County |
Biscayne Bay Spoil Island #6 Enhancements |
DA-98-49 |
$112,500.00 |
$225,000.00 |
Miami - Dade County |
Haulover Park Marina Renovations ( Project Expired) |
DA-98-48 |
$1,400,000.00 |
$2,800,000.00 |
City Of Miami Dept. Of Parks & Rec. |
Peacock Park Shoreline Educational Enhancement |
DA-MI-97-47 |
$100,000.00 |
$200,000.00 |
Miami - Dade County |
Biscayne Bay Spoil Island #1 Enhancement |
DA-97-46 |
$115,000.00 |
$230,000.00 |
Miami - Dade County Park & Rec. |
Crandon Park Marina Pier Renovation - Phase I I |
DA-97-45 |
$920,000.00 |
$1,840,000.00 |
Miami - Dade County Park & Recreation |
M.S.D. Biscayne Nature Center |
DA-96-43 |
$800,000.00 |
$3,530,000.00 |
Miami - Dade County |
Manatee Halfway House ( Project Expired) |
DA-96-42 |
$25,000.00 |
$100,000.00 |
Miami - Dade County |
Homestead Bayfront Park Shoreline Stabilization |
DA-96-41 |
$50,000.00 |
$100,000.00 |
Miami - Dade County |
Biscayne Bay Spoil Island (#14) Enhancement Project |
DA-96-40 |
$105,000.00 |
$210,000.00 |
City Of Miami |
Baywood Park Shoreline Enhancement Project |
DA-MI-95-39 |
$75,590.00 |
$199,971.72 |
Miami - Dade County |
Biscayne Bay Restoration |
DA-87-4 |
$160,310.00 |
$500,000.00 |
Miami - Dade County |
Biscayne Bay Restoration |
DA-88-7 |
$75,000.00 |
$222,500.00 |
Miami - Dade County D.E.R.M. |
Biscayne Bay Restoration & Enhancement Project |
DA-89-11 |
$98,000.00 |
$216,300.00 |
Miami - Dade County |
Biscayne Bay Spoil Island #2 Enhancement Project |
DA-95-37 |
$180,262.00 |
$360,525.00 |
Miami - Dade County |
Cape Florida Shoreline Stabilization |
DA-93-30 |
$340,000.00 |
$739,700.98 |
Miami - Dade County |
Crandon Marina Boat Ramp Renovation |
DA-95-35 |
$174,400.00 |
$348,800.00 |
Miami - Dade County Park & Recreation |
Crandon Park Marina Renovations |
DA-94-31 |
$900,000.00 |
$1,800,000.00 |
Miami - Dade County |
Crandon Park Marina Renovations I I |
DA-95-36 |
$300,000.00 |
$600,000.00 |
Miami - Dade County |
Deering Environmental Education Facilities |
DA-91-19 |
$650,000.00 |
$4,400,000.00 |
Miami - Dade County |
Derelict Vessel Removal Project |
DA-95-38 |
$102,577.00 |
$205,155.00 |
Miami - Dade County |
Flagler Memorial Island Enhancement |
DA-93-27 |
$175,000.00 |
$300,800.52 |
Miami - Dade County |
Haulover Boat Ramp Fish Cleaning Station ( Withdrawn) |
DA-00-62 |
$20,000.00 |
$40,000.00 |
Miami - Dade County |
Haulover Inlet Spoil Island Enhancement Project |
DA-91-18 |
$200,000.00 |
$714,448.00 |
Miami - Dade County |
Haulover Park Marina Renovation Designs |
DA-95-33 |
$60,000.00 |
$120,000.00 |
Miami - Dade County Park & Rec. |
Hurricane Andrew Marina Improvement - Phase I |
DA-92-26 |
$463,670.00 |
$463,670.00 |
Miami - Dade County Park & Rec. |
Hurricane Andrew Marina Improvement - Phase I I |
DA-93-28 |
$850,000.00 |
$1,800,000.00 |
Miami - Dade County |
Hurricane Preparedness Manual For Vessels |
DA-91-16 |
$35,000.00 |
$70,000.00 |
Bal Harbour Village |
Jetty and Groin Repairs |
DA-BH-2 |
$200,000.00 |
$400,000.00 |
City of North Miami Beach |
Law Enforcement/Rescue Boat & Equipment |
DA-NMB-91-21 |
$25,000.00 |
$62,455.00 |
City Of Miami Beach Police Department |
Marine Law Enforcement & Safety Project |
DA-MB-93-29 |
$35,000.00 |
$35,000.00 |
Miami - Dade County Parks & Rec. Dept. |
Marjory Stoneman Douglas Biscayne Nature Center Designs |
DA-92-25 |
$187,500.00 |
$375,000.00 |
Miami - Dade County |
Matheson Hammock Marina Boat Ramp Renovation |
DA-95-34 |
$116,200.00 |
$232,400.00 |
City of Miami Beach |
Miami Beach Marina Shoreline Stabilization |
DA-MB-92-22 |
$200,000.00 |
$454,675.00 |
City Of Miami |
Morningside Seawall Improvements |
DA-MI-96-44 |
$34,250.00 |
$68,500.00 |
City Of North Bay Village |
Navigational Buoys ( Expired) |
DA-NBV-01-69 |
$6,250.00 |
$15,000.00 |
Miami - Dade County D.E.R.M. |
North Miami Spoil Island Enhancement Project |
DA-92-23 |
$196,030.00 |
$412,060.00 |
Miami - Dade County |
Pelican Harbor Marina |
DA-1 |
$400,000.00 |
$4,075,000.00 |
Miami - Dade County |
Pelican Harbor Marina |
DA-87-3 |
$750,000.00 |
$3,300,000.00 |
Miami - Dade County |
Pelican Harbor Marina |
DA-89-10 |
$500,000.00 |
$4,975,000.00 |
Miami - Dade County Parks & Rec. Dept. |
Pelican Harbor Marina Facilities |
DA-92-24 |
$500,000.00 |
$740,000.00 |
Miami - Dade County |
Pelican Harbor Spoil Island |
DA-90-15 |
$320,000.00 |
$640,000.00 |
Bal Harbour Village |
Public Works Compound Seawall |
DA-BH-88-6 |
$29,265.00 |
$58,530.00 |
Miami - Dade County |
Restoration of Dredge Areas |
DA-90-13 |
$97,755.00 |
$195,570.00 |
Miami - Dade County |
Restoration of Dredged Areas |
DA-91-17 |
$180,000.00 |
$365,950.00 |
City Of Miami Beach |
Shoreline Stab. Of Monument Island - Ph. I ( Withdrawn) |
DA-MB-03-80 |
$50,000.00 |
$100,000.00 |
Miami - Dade County |
Spoil Island Enhancement |
DA-87-5 |
$86,000.00 |
$300,000.00 |
Miami - Dade County |
Spoil Island Enhancement |
DA-90-14 |
$40,000.00 |
$80,000.00 |
Miami - Dade County |
Spoil Island Restoration |
DA-89-12 |
$96,875.00 |
$193,750.00 |
Miami - Dade County |
Venetian Causeway Design |
DA-88-9 |
$250,000.00 |
$500,000.00 |
Miami - Dade County |
Venetian Causeway Repairs |
DA-88-8 |
$157,500.00 |
$315,000.00 |
Miami - Dade County |
Venetian Causeway Shoreline Stabilization Project |
DA-94-32 |
$101,200.00 |
$240,311.72 |
City of North Miami Beach |
Waterway Signage Video Program |
DA-NMB-91-20 |
$16,000.00 |
$45,300.00 |
Miami - Dade County |
Pelican Marina Boat Ramp Renovation - PH II |
DA-17-221 |
$992,000.00 |
$1,984,000.00 |
Miami - Dade County |
Haulover Marina Wet-Slips Electrical Upgrades |
DA-17-222 |
$311,819.00 |
$623,637.00 |
City of Miami |
Virginia Key Seawall, Dock & Kayak Launch, PH II |
DA-MI-17-212 |
$1,230,869.00 |
$2,769,380.00 |
City of Miami |
Myers Park Seawall, Boat Ramp & Parking, PH I |
DA-MI-17-213 |
$100,870.00 |
$220,220.00 |
City of Miami |
Knight Center Dockage, PH I |
DA-MI-17-214 |
$72,855.00 |
$153,081.00 |
City of Miami |
First Presbyterian Church Baywalk, PH I |
DA-MI-17-215 |
$153,121.50 |
$366,678.00 |
City of Miami |
Spring Garden Park Seawall and Kayak Launch |
DA-MI-17-216 |
$552,309.00 |
$1,215,080.00 |
City of Miami |
Seybold Canal and Wagner Creek Dredging, PH G |
DA-MI-17-217 |
$1,000,000.00 |
$2,000,000.00 |
City of Miami |
25th Rd Seawall, Baywalk & Dock , PH I |
DA-MI-17-218 |
$84,409.00 |
$201,457.00 |
City of Miami |
MPD Marine Patrol Vessel |
DA-MI-17-219 |
$59,000.00 |
$118,000.00 |
City of Miami |
Regatta Park Baywalk, Boat Hoists, Dock, PH II |
DA-MI-17-220 |
$400,000.00 |
$916,300.00 |
Miami-Dade County |
Haulover Park Marina Boat Ramp and Parking Renovations Phase I |
DA-18-224 |
$283,000.00 |
$740,000 |
Miami-Dade County |
Pelican Harbor Marina Dredging Dock D Phase I |
DA-18-225 |
$32,500.00 |
$95,500 |
City of Miami |
Alice Wainwright Park Seawall and Baywalk Phase II |
DA-MI-18-226 |
$2,202,399.00 |
$4,664,981 |
City of Miami |
Jose Marti Park Seawall Riverwalk and Kayak Launch Phase I |
DA-MI-18-227 |
$149,347.00 |
$448,271 |
City of Miami |
Little River Mini Park Seawall and Baywalk Phase I |
DA-MI-18-228 |
$41,990.00 |
$115,873 |
City of Miami |
Miamarina Bayside Wharf Pier 5 Phase II |
DA-MI-18-229 |
$1,325,000.00 |
$2,650,000 |
City of Miami |
Morningside Park Floating Dock Phase II* |
DA-MI-18-230 |
$87,725.00 |
$198,001 |
City of Miami |
Dinner Key North Mooring Field Phase II |
DA-MI-18-231 |
$250,000.00 |
$500,000 |
City of Miami |
Legion Park Seawall and Boat Ramp Phase II |
DA-MI-18-232 |
$740,139.00 |
$1,657,911 |
City of Miami Beach |
Maurice Gibb Park Dock and Launch Project Phase II |
DA-MB-18-233 |
$226,363.00 |
$452,726 |
City of North Miami |
Channel Marker Replacement |
DA-NM-18-234 |
$25,000.00 |
$50,000 |
North Bay Village |
Baywalk Plaza South Phase IIIA |
DA-NBV-18-235 |
$180,000.00 |
$360,000 |
|
|
|
|
|
|
|
TOTALS: |
$68,577,512.64 |
$192,248,649.68 |
|
|
|
|
|