Waterways Assistance Programs - Miami-Dade County

Waterways Assistance Projects
1986-2016
 

PROJECT NAME

PROJECT NUMBER

PROJECT SPONSOR

GRANT AMOUNT

TOTAL COST

Flagler Memorial Is. Enhancements- PH II

DA-00-61

Miami-Dade County

$42,500.00

$102,500.00

Haulover Boat Ramp Fish Cleaning Station

DA-00-62

Miami-Dade County

WITHDRAWN

WITHDRAWN

Crandon Park Marina Pier Renovations - II

DA-01-66

Miami-Dade County

$403,129.00

$878,271.00

Haulover Park Marina Renovations

DA-01-67

Miami-Dade County

$1,400,000.00

$2,800,000.00

Spoil Island #3 Enhancement Project

DA-01-68

Miami-Dade County

$105,000.00

$210,000.00

Miami River Dredging Project - Stage II

DA-02-72

Miami-Dade County

$300,000.00

$6,000,000.00

Black Point & Homestead Marina Piling Replacement

DA-02-73

Miami-Dade County

$125,000.00

$250,000.00

Crandon Park Marina Dockmaster's Complex - Phase I

DA-02-74

Miami-Dade County

$75,000.00

$150,000.00

Homestead Bayfront Marina Navigation Improvements - Phase I

DA-02-75

Miami-Dade County

$50,000.00

$100,000.00

Pelican Harbor Fishing Pier Replacement - Phase I

DA-02-76

Miami-Dade County

WITHDRAWN

WITHDRAWN

Pelican Harbor Marina Mooring Field - Phase I

DA-02-77

Miami-Dade County

WITHDRAWN

WITHDRAWN

Haulover Marina Dockmaster's Complex - Phase I

DA-03-81

Miami-Dade County

WITHDRAWN

WITHDRAWN

Spring Garden Point Park Shoreline Enhancement

DA-03-82

Miami-Dade County

$138,000.00

$370,000.00

Haulover Marina Breakwater Completion

DA-04-86

Miami-Dade County

$1,134,243.00

$4,112,392.00

Haulover Marina Dredging, Seawall, Dock & Wetslips

DA-05-91

Miami-Dade County

$1,135,000.00

$4,882,000.00

Homestead Bayfront Channel Markers Relocation

DA-05-92

Miami-Dade County

$56,150.00

$112,300.00

Homestead Bayfront Marina Boater's Complex - Phase II

DA-06-96

Miami-Dade County

EXPIRED

EXPIRED

Parcel B Public Shoreline Stabilization

DA-06-97

Miami-Dade County

$178,596.00

$372,075.00

Pelican Harbor Marina Boater's Complex - Phase I

DA-06-98

Miami-Dade County

$111,000.00

$222,000.00

Parcel B Public Shoreline Stabilization - Stage 2

DA-07-102

Miami-Dade County

$2,000,000.00

$4,200,000.00

Pelican Harbor Marina Restrooms & Boater Amenities

DA-08-106

Miami-Dade County

$493,716.00

$987,433.00

Crandon Marina Seawall Restoration

DA-09-114

Miami-Dade County

$597,633.00

$1,195,266.00

Fire Rescue Floating Dock & Boat Lift

DA-09-115

Miami-Dade County

$111,150.00

$273,882.50

R. Hardy Matheson Preserve Shoreline Stabilization

DA-09-116

Miami-Dade County

$550,000.00

$1,100,000.00

Pelican Harbor Marina

DA-1

Miami-Dade County

$400,000.00

$4,075,000.00

Crandon Marina Seawall #2 Replacement

DA-10-121

Miami-Dade County

$1,342,932.00

$2,685,865.00

Pelican Harbor Marina Elec., Water & Fire Systems - Phase I

DA-10-122

Miami-Dade County

$56,000.00

$112,000.00

Dinner Key Spoil Islands B & C Shoreline Stabilization

DA-11-132

Miami-Dade County

$300,000.00

$600,000.00

Miami Marine Stadium Park Shoreline Stabilization

DA-11-133

Miami-Dade County

$400,000.00

$800,000.00

Vizcaya Public Shoreline Stabilization - Phase I

DA-11-134

Miami-Dade County

$41,000.00

$84,500.00

Miami River Greenways Riverwalk

DA-12-143

Miami-Dade County

$500,000.00

$1,134,297.00

Pelican Harbor Marina Improvements

DA-12-144

Miami-Dade County

$1,200,000.00

$2,400,000.00

Vizcaya Public Shoreline Stabilization - Phase I

DA-12-145

Miami-Dade County

$134,000.00

$268,000.00

Crandon Marina Boat Ramp Renovations - Phase I

DA-13-159

Miami-Dade County

$70,000.00

$169,500.00

Matheson Hammock Marina Boat Ramp Renovations - Phase I

DA-13-160

Miami-Dade County

$75,000.00

$177,000.00

Miami River Greenway Sites 4 & 5

DA-13-161

Miami-Dade County

$500,000.00

$1,024,025.00

Pelican Marina Wet Slips Frameworks Replacements

DA-14-170

Miami-Dade County

$256,470.00

$512,940.00

Pelican Island Day Dock Replacement - Phase I

DA-14-171

Miami-Dade County

$37,296.00

$74,592.00

Pelican Marina Boat Ramp Renovation - Phase I

DA-14-172

Miami-Dade County

$60,000.00

$167,000.00

Matheson Marina Floating Dock Renovations

DA-14-173

Miami-Dade County

$239,259.00

$478,516.00

Black Point Marina Wetslips Frames Replacement

DA-14-69

Miami-Dade County

$349,170.00

$678,000.00

Crandon Marina Boat Ramps

DA-15-189

Miami-Dade County

$215,266.00

$430,531.00

Matheson Hammock Marina Wetslip Renovations

DA-15-190

Miami-Dade County

$104,699.00

$209,399.00

Matheson Hammock Marina Boat Ramps

DA-15-191

Miami-Dade County

$283,059.00

$566,118.00

Crandon Floating Dock Renovations

DA-15-192

Miami-Dade County

$389,381.00

$778,763.00

Homestead Bayfront Marina Wet Slip Renovations

DA-15-193

Miami-Dade County

$205,000.00

$410,000.00

Pelican Harbor Marina

DA-87-3

Miami-Dade County

$750,000.00

$3,300,000.00

Biscayne Bay Restoration

DA-87-4

Miami-Dade County

$160,310.00

$500,000.00

Spoil Island Enhancement

DA-87-5

Miami-Dade County

$86,000.00

$300,000.00

Biscayne Bay Restoration

DA-88-7

Miami-Dade County

$75,000.00

$222,500.00

Venetian Causeway Repairs

DA-88-8

Miami-Dade County

$157,500.00

$315,000.00

Venetian Causeway Design

DA-88-9

Miami-Dade County

$250,000.00

$500,000.00

Pelican Harbor Marina

DA-89-10

Miami-Dade County

$500,000.00

$4,975,000.00

Biscayne Bay Restoration & Enhancement Project

DA-89-11

Miami-Dade DERM

$98,000.00

$216,300.00

Spoil Island Restoration

DA-89-12

Miami-Dade County

$96,875.00

$193,750.00

Restoration of Dredge Areas

DA-90-13

Miami-Dade County

$97,755.00

$195,570.00

Spoil Island Enhancement

DA-90-14

Miami-Dade County

$40,000.00

$80,000.00

Pelican Harbor Spoil Island

DA-90-15

Miami-Dade County

$320,000.00

$640,000.00

Hurricane Preparedness Manual for Vessels

DA-91-16

Miami-Dade County

$35,000.00

$70,000.00

Restoration of Dredged Areas

DA-91-17

Miami-Dade County

$180,000.00

$365,950.00

Haulover Inlet Spoil Island Enhancement Project

DA-91-18

Miami-Dade County

$200,000.00

$714,448.00

Deering Environmental Education Facilities

DA-91-19

Miami-Dade County

$650,000.00

$4,400,000.00

North Miami Spoil Island Enhancement Project

DA-92-23

Miami-Dade County DERM

$196,030.00

$412,060.00

Pelican Harbor Marina Facilities

DA-92-24

Miami-Dade County Park & Recreation Dept.

$500,000.00

$740,000.00

Marjory Stoneman Douglas Biscayne Nature Center Designs

DA-92-25

Miami-Dade County Park & Recreation Dept.

$187,500.00

$375,000.00

Hurricane Andrew Marina Improvement - Phase I

DA-92-26

Miami-Dade County Park & Recreation Dept.

$463,670.00

$463,670.00

Flagler Memorial Island Enhancement

DA-93-27

Miami-Dade County

$175,000.00

$300,800.52

Hurricane Andrew Marina Improvement - Phase II

DA-93-28

Miami-Dade County Park & Recreation Dept.

$850,000.00

$1,800,000.00

Cape Florida Shoreline Stabilization

DA-93-30

Miami-Dade County

$340,000.00

$739,700.98

Crandon Park Marina Renovations

DA-94-31

Miami-Dade County Park & Recreation Dept.

$900,000.00

$1,800,000.00

Venetian Causeway Shoreline Stabilization Project

DA-94-32

Miami-Dade County

$101,200.00

$240,311.72

Haulover Park Marina Renovation Designs

DA-95-33

Miami-Dade County

$60,000.00

$120,000.00

Matheson Hammock Marina Boat Ramp Renovation

DA-95-34

Miami-Dade County

$116,200.00

$232,400.00

Crandon Marina Boat Ramp Renovation

DA-95-35

Miami-Dade County

$174,400.00

$348,800.00

Crandon Park Marina Renovations II

DA-95-36

Miami-Dade County

$300,000.00

$600,000.00

Biscayne Bay Spoil Island #2 Enhancement Project

DA-95-37

Miami-Dade County

$180,262.00

$360,525.00

Derelict Vessel Removal Project

DA-95-38

Miami-Dade County

$102,577.00

$205,155.00

Biscayne Bay Spoil Island (#14) Enhancement Project

DA-96-40

Miami-Dade County

$105,000.00

$210,000.00

Homestead Bayfront Park Shoreline Stabilization

DA-96-41

Miami-Dade County

$50,000.00

$100,000.00

Manatee Halfway House

DA-96-42

Miami-Dade County

EXPIRED

EXPIRED

M.S.D. Biscayne Nature Center

DA-96-43

Miami-Dade County Park & Recreation Dept.

$800,000.00

$3,530,000.00

Crandon Park Marina Pier Renovation - Phase II

DA-97-45

Miami-Dade County

$920,000.00

$1,840,000.00

Biscayne Bay Spoil Island #1 Enhancement

DA-97-46

Miami-Dade County

$115,000.00

$230,000.00

Haulover Park Marina Renovations

DA-98-48

Miami-Dade County

EXPIRED

EXPIRED

Biscayne Bay Spoil Island #6 Enhancements

DA-98-49

Miami-Dade County

$112,500.00

$225,000.00

Haulover Marina Expansion Designs

DA-99-52

Miami-Dade County

$148,250.00

$296,500.00

Haulover Marina Boat Ramp Renovations

DA-99-53

Miami-Dade County

$183,750.00

$367,500.00

Spoil Island #9 & #10 Enhancements

DA-99-54

Miami-Dade County

$135,000.00

$316,265.00

Sand Bypass at Bakers Haulover Inlet - Phase I

DA-BH-12-135

Bal Harbour Village

WITHDRAWN

WITHDRAWN

Jetty and Groin Repairs

DA-BH-2

Bal Harbour Village

$200,000.00

$400,000.00

Public Works Compound Seawall

DA-BH-88-6

Bal Harbour Village

$29,265.00

$58,530.00

Waterfront Park

DA-BHI-05-87

Town of Bay Harbor Islands

$92,000.00

$184,000.00

The Strand Park Boat Dock

DA-GB-11-124

Town of Golden Beach

$29,735.00

$78,664.00

Marine Patrol Vessel

DA-ICV-01-64

Indian Creek Village

$18,880.00

$37,760.00

Miamarina Seawall Replacement - Phase I

DA-MA-08-104

City of Miami

$40,000.00

$80,000.00

Citywide Seawalls - Phase I

DA-MB-02-71

City of Miami Beach

$135,000.00

$270,720.00

Shoreline Stabilization of Monument Isl. - Phase I

DA-MB-03-80

City of Miami Beach

WITHDRAWN

WITHDRAWN

Citywide Seawalls - Phase II

DA-MB-04-85

City of Miami Beach

$293,562.00

$636,626.00

South Pointe Park Pier Renovation & Expansion - Phase I

DA-MB-08-105

City of Miami Beach

$323,075.00

$969,230.00

Pine Tree Park Shoreline Improvements

DA-MB-09-113

City of Miami Beach

$74,766.00

$248,090.00

Biscayne Bay 10th Street-End Park & Seawall

DA-MB-11-131

City of Miami Beach

$472,820.00

$945,640.00

South Pointe Pier Construction - Phase II

DA-MB-12-142

City of Miami Beach

$986,000.00

$4,098,381.00

Indian Creek Park Seawall - Phase I

DA-MB-13-157

City of Miami Beach

$160,000.00

$320,000.00

Parks Blueways Master Plan

DA-MB-13-158

City of Miami Beach

$40,000.00

$80,000.00

Normandy Shores Park Seawall

DA-MB-14-167

City of Miami Beach

$225,478.00

$450,956.00

Indian Creek Park Seawall Construction

DA-MB-14-168

City of Miami Beach

$692,501.50

$1,385,003.00

Maurice Gibb Memorial Park Dock & Launch - Phase I

DA-MB-15-195

City of Miami Beach

$75,000.00

$150,000.00

Miami Beach Marina Shoreline Stabilization

DA-MB-92-22

City of Miami Beach

$200,000.00

$454,675.00

Marine Law Enforcement & Safety Project

DA-MB-93-29

City of Miami Beach Police Department

$35,000.00

$35,000.00

Watson Island Boat Ramp Replacement

DA-MI-00-59

City of Miami

$150,000.00

$300,000.00

Derelict Vessel Removal

DA-MI-00-60

City of Miami

$34,137.00

$68,275.00

Legion Park Waterfront Enhancement

DA-MI-01-65

City of Miami

$90,000.00

$180,000.00

Intracoastal Watersports Center - Public Baywalk Overlook

DA-MI-02-70

City of Miami

$200,371.00

$486,500.00

Bicentennial Park Shoreline Stabilization - Stage I

DA-MI-03-78

City of Miami

$700,000.00

$1,400,000.00

Dinner Key Mooring & Anchorage Field Project - Phase I

DA-MI-03-79

City of Miami

$32,500.00

$100,000.00

Bicentennial Park Shoreline Stabilization - Phase II

DA-MI-04-83

City of Miami

$419,670.00

$2,398,000.00

Derelict Vessel Removal

DA-MI-04-84

City of Miami

$50,000.00

$100,000.00

Bicentennial Park Shoreline Stabilization - Phase III

DA-MI-05-88

City of Miami

$1,000,000.00

$2,000,000.00

Dinner Key Spoil Island Enhancement

DA-MI-05-89

City of Miami

$425,000.00

$850,000.00

Seminole Public Dinghy Dock Replacement

DA-MI-05-90

City of Miami

$28,350.00

$62,700.00

Bicentennial Park Shoreline Stabilization - Phase III-C

DA-MI-06-93

City of Miami

$1,000,000.00

$2,000,000.00

Dinner Key Mooring Field Project - Phase II

DA-MI-06-94

City of Miami

$424,745.00

$841,500.00

Sewell Park Kayak Launch - Phase I

DA-MI-06-95

City of Miami

$8,500.00

$17,000.00

Dinner Key Mooring Field Dredging - Phase II

DA-MI-07-100

City of Miami

$390,000.00

$800,000.00

Construction of Sewell Park Kayak Launch - Phase II

DA-MI-07-101

City of Miami

$37,625.00

$75,250.00

Bicentennial Park Mooring Bollards Design - Phase I

DA-MI-08-103

City of Miami

$42,450.00

$84,900.00

Miamarina Seawall Replacement - Phase I

DA-MI-08-104

City of Miami

$40,000.00

$80,000.00

Bicentennial Park Mooring Bollards Construction

DA-MI-09-107

City of Miami

$513,255.00

$1,026,510.00

Coconut Grove Public Piers - Phase I

DA-MI-09-108

City of Miami

WITHDRAWN

WITHDRAWN

James L. Knight Center Riverwalk Repl. - Phase I

DA-MI-09-109

City of Miami

WITHDRAWN

WITHDRAWN

Kennedy Park Floating Dock - Phase I

DA-MI-09-110

City of Miami

$17,500.00

$35,000.00

Kennedy Park Shoreline Stabilization - Phase I

DA-MI-09-111

City of Miami

$40,000.00

$80,000.00

Marine Stadium Marina Seawall Replacement - Phase I

DA-MI-09-112

City of Miami

$17,500.00

$35,000.00

Citywide Derelict Vessel Removal

DA-MI-10-117

City of Miami

$20,000.00

$45,000.00

Miami Marine Stadium Restoration - Phase I

DA-MI-10-118

City of Miami

EXPIRED

EXPIRED

Miami Woman's Club Baywalk - Phase I

DA-MI-10-119

City of Miami

EXPIRED

EXPIRED

Spoil Island E Restoration & Floating Dock - Phase I

DA-MI-10-120

City of Miami

$15,000.00

$30,000.00

Baywalk at Bicentennial Park

DA-MI-11-125

City of Miami

$1,143,000.00

$2,286,000.00

Kennedy Park Floating Dock Construction & Restoration

DA-MI-11-126

City of Miami

$60,000.00

$120,000.00

Kennedy Park Shoreline Stabilization & Restoration

DA-MI-11-127

City of Miami

$75,000.00

$150,000.00

Little River Waterfront Park

DA-MI-11-128

City of Miami

$117,500.00

$470,000.00

Marine Stadium Marina at Virginia Key - Phase I

DA-MI-11-129

City of Miami

EXPIRED

EXPIRED

Seybold Canal & Wagner Creek Dredging & Environmental Clean Up

DA-MI-11-130

City of Miami

EXPIRED

EXPIRED

Little River Waterfront Acquisition - Phase B

DA-MI-12-136

City of Miami

EXPIRED

EXPIRED

Manatee Bend Park Seawall Improvements & Kayak Launch - Phase I

DA-MI-12-137

City of Miami

WITHDRAWN

WITHDRAWN

Marine Stadium Marina Seawall Replacement - Phase II

DA-MI-12-138

City of Miami

$785,000.00

$1,570,000.00

Pallot Park Shoreline Stabilization - Phase I

DA-MI-12-139

City of Miami

WITHDRAWN

WITHDRAWN

Seybold Canal & Wagner Creek Dredging - Phase B

DA-MI-12-140

City of Miami

EXPIRED

EXPIRED

Spoil Island E Floating Dock Restoration - Phase II

DA-MI-12-141

City of Miami

$57,500.00

$115,000.00

Miami Marine Stadium In-Water Structural Assessment - Phase I

DA-MI-13-150

City of Miami

$157,900.00

$315,800.00

Miami Women's Club Baywalk - Phase 2

DA-MI-13-151

City of Miami

$150,000.00

$300,000.00

Seybold Canal & Wagner Creek Dredging - Phase C

DA-MI-13-152

City of Miami

$1,000,000.00

$2,000,000.00

Virginia Key Nature Center Seawall & Kayak Launch - Phase I

DA-MI-13-153

City of Miami

$37,500.00

$75,000.00

Curtis Park Boat Ramp Repair & Reconstruction - Phase 2

DA-MI-13-154

City of Miami

$190,050.00

$380,100.00

Lummus Landing Riverwalk and Dock

DA-MI-13-155

City of Miami

$570,000.00

$1,140,000.00

Manatee Bend Park Seawall - Phase II

DA-Mi-13-156

City of Miami

$325,000.00

$650,000.00

Seybold Canal & Wagner Creek Dredging - Phase D

DA-MI-14-162

City of Miami

$1,000,000.00

$2,000,000.00

Baywalk Floating Dock Regatta Park - Phase I

DA-MI-14-164

City of Miami

$20,000.00

$40,000.00

Virginia Key Beach Park Tiki Village

DA-MI-14-165

City of Miami

$16,930.00

$33,860.00

Virginia Key Beach Park Education Signs

DA-MI-14-166

City of Miami

$9,400.00

$18,800.00

Miami Marina Park Wet Slips & Mooring - Phase I

DA-MI-15-175

City of Miami

$50,000.00

$100,000.00

Pallot Park Seawall, Baywalk & Kayak - Phase II

DA-MI-15-176

City of Miami

$150,000.00

$300,000.00

Baywood Park Seawall - Phase I

DA-MI-15-177

City of Miami

$25,000.00

$50,000.00

Seybold Canal & Wagner Creek Dredging - Phase E

DA-MI-15-178

City of Miami

$700,000.00

$1,400,000.00

Baywalk Southside FEC Slip - Phase II

DA-MI-15-179

City of Miami

$1,250,000.00

$2,500,000.00

Spring Garden Park Seawall & Kayak - Phase I

DA-MI-15-180

City of Miami

$75,000.00

$150,000.00

Derelict Vessel Removal - City of Miami

DA-MI-15-181

City of Miami

$30,000.00

$60,000.00

Miamarina Upgrade of Electrical System

DA-MI-15-182

City of Miami

$375,000.00

$750,000.00

Marine Stadium Baywalk - Phase II

DA-MI-15-183

City of Miami

$500,000.00

$1,000,000.00

Morningside Park Seawall & Boat Launch - Phase I

DA-MI-15-184

City of Miami

$25,000.00

$50,000.00

Dinner Key Marina Pumpout Upgrade

DA-MI-15-185

City of Miami

$150,000.00

$500,000.00

Alice Wainwright Park Seawall & Baywalk - Phase I

DA-MI-15-186

City of Miami

$62,500.00

$125,000.00

Bayside Wharf at Miamarina - Phase I

DA-MI-15-187

City of Miami

$50,000.00

$100,000.00

Legion Park Seawall & Boat Ramp - Phase I

DA-MI-15-188

City of Miami

$50,000.00

$100,000.00

Baywood Park Shoreline Enhancement Project

DA-MI-95-39

City of Miami

$75,590.00

$199,971.72

Morningside Seawall Improvements

DA-MI-96-44

City of Miami

$34,250.00

$68,500.00

Peacock Park Shoreline Educational Enhancement

DA-MI-97-47

City of Miami

$100,000.00

$200,000.00

Watson Island Boat Ramp Repairs

DA-MI-98-51

City of Miami

$142,000.00

$357,687.00

Margaret Pace Park

DA-MI-99-56

City of Miami

$196,085.00

$392,170.00

Kenneth Myers Park/Seminole Boat Ramp

DA-MI-99-57

City of Miami

$180,000.00

$488,333.00

Marine Patrol Boat

DA-NBV-00-63

City of North Bay Village

$50,406.00

$67,208.00

Navigational Buoys

DA-NBV-01-69

City of North Bay Village

EXPIRED

EXPIRED

Paul Vogel Community Park Seawall & Dock Repl. - Phase I

DA-NBV-10-123

City of North Bay Village

EXPIRED

EXPIRED

Baywalk Plaza Area - Phase I

DA-NBV-12-146

City of North Bay Village

$50,250.00

$100,500.00

Vogel Park Improvements

DA-NBV-12-147

City of North Bay Village

$110,167.00

$220,335.00

Baywalk Plaza - Phase IIA

DA-NBV-15-194

North Bay Village

$200,000.00

$400,000.00

N. Bayshore William Lehman Park Fishing & Pier Restoration

DA-NM-13-148

City of North Miami

$300,000.00

$630,000.00

William Lehman Park Fishing & Viewing Piers - Phase I

DA-NM-98-50

City of North Miami

$15,734.00

$31,469.00

William Lehman Park Fishing & Viewing Piers - Phase II

DA-NM-99-55

City of North Miami

$33,475.00

$66,950.00

Maule Lake Derelict Vessel Removal

DA-NMB-06-99

City of North Miami Beach

$40,000.00

$85,000.00

Waterway Signage Video Program

DA-NMB-91-20

City of North Miami Beach

$16,000.00

$45,300.00

Law Enforcement/Rescue Boat & Equipment

DA-NMB-91-21

City of North Miami Beach

$25,000.00

$62,455.00

Boating Safety & Environmental Education Program

DA-SI-99-58

Sunny Isles Beach Police Dept.

$45,603.06

$60,804.08

Surfside Seawall Replacement

DA-SU-13-149

Town of Surfside

$494,445.00

$988,890.00

Surfside Seawall Replacement - Part 2

DA-SU-15-174

Town of Surfside

$346,250.00

$692,500.00

TOTALS  

$51,638,398.56

$153,807,914.52