Waterways Assistance Projects
1986-2016
PROJECT NAME |
PROJECT NUMBER |
PROJECT SPONSOR |
GRANT AMOUNT |
TOTAL COST |
Peanut Island Park - Phase IV |
PB-00-90 |
Palm Beach County |
$525,000.00 |
$6,344,431.00 |
Phil Foster Park - Phase I |
PB-01-94 |
Palm Beach County |
$100,000.00 |
$200,000.00 |
Ship For Kids |
PB-01-95 |
Palm Beach County |
$75,000.00 |
$150,000.00 |
Lake Worth Wetlands Restoration Project |
PB-02-101 |
Palm Beach County |
$400,000.00 |
$13,968,377.00 |
Lake Worth Lagoon Artificial Reef at Kelsey Park |
PB-03-107 |
Palm Beach County |
$100,000.00 |
$200,000.00 |
Phil Foster Park Phase III Development |
PB-03-108 |
Palm Beach County |
$720,000.00 |
$1,440,000.00 |
Burt Reynolds Park Phase A Development |
PB-04-110 |
Palm Beach County |
$400,000.00 |
$1,000,000.00 |
DuBois Park - Phase I |
PB-05-114 |
Palm Beach County |
$61,854.00 |
$250,000.00 |
Burt Reynolds Park - Phase II |
PB-06-121 |
Palm Beach County |
$806,750.00 |
$2,413,500.00 |
Moroso Waterway Park (F.K.A. Light Harbor Marina) |
PB-07-126 |
Palm Beach County |
$987,000.00 |
$2,476,321.00 |
S. Lake Worth Inlet Sand Trap & Boat Channel Dredging |
PB-07-127 |
Palm Beach County |
$233,220.00 |
$897,000.00 |
John's Island Oyster Reef Project |
PB-08-132 |
Palm Beach County |
$200,000.00 |
$680,000.00 |
Snook Islands Public Use Facilities |
PB-08-133 |
Palm Beach County |
$639,575.00 |
$1,279,150.00 |
Dubois Park Marina & Shoreline Stabilization |
PB-09-140 |
Palm Beach County |
$987,000.00 |
$2,587,975.00 |
Burt Reynolds Park Staging Dock Extension |
PB-10-146 |
Palm Beach County |
$75,000.00 |
$150,000.00 |
Jupiter Ridge Shoreline Restoration Project |
PB-10-147 |
Palm Beach County |
$500,000.00 |
$1,479,718.00 |
South Cove Restoration and Boardwalk |
PB-10-148 |
Palm Beach County |
$1,000,000.00 |
$4,388,000.00 |
Waterway Park Design & Permitting - Phase I |
PB-10-149 |
Palm Beach County |
EXPIRED |
EXPIRED |
Bert Winters Boat Ramp - Phase I |
PB-11-152 |
Palm Beach County |
EXPIRED |
EXPIRED |
Bryant Park Wetland Restoration & Boat Ramp Facility |
PB-11-153 |
Palm Beach County |
$255,000.00 |
$625,000.00 |
John's Island Oyster Reef Project - Phase B |
PB-11-154 |
Palm Beach County |
$406,250.00 |
$812,500.00 |
Lake Wyman Restoration Project |
PB-11-155 |
Palm Beach County |
EXPIRED |
EXPIRED |
Burt Reynolds Park - West Side Design - Phase I |
PB-12-162 |
Palm Beach County |
$50,000.00 |
$100,000.00 |
Fullerton Island Restoration Project |
PB-12-163 |
Palm Beach County |
$794,030.00 |
$2,532,710.00 |
Bert Winters Park Acquisition |
PB-13-169 |
Palm Beach County |
$250,000.00 |
$1,000,000.00 |
Highland Beach Mangroves Shoreline Restoration |
PB-13-170 |
Palm Beach County |
$258,037.00 |
$516,075.00 |
Juno Dunes Shoreline Restoration |
PB-13-171 |
Palm Beach County |
$280,725.00 |
$561,450.00 |
Ocean Inlet Design and Permitting |
PB-13-172 |
Palm Beach County |
$75,000.00 |
$150,000.00 |
Waterway Park Development |
PB-13-173 |
Palm Beach County |
$1,420,396.00 |
$2,840,792.00 |
Burt Reynolds Park West Side Redevelopment |
PB-14-180 |
Palm Beach County |
$750,000.00 |
$1,500,000.00 |
Waterway Park Development - Phase IIB |
PB-14-181 |
Palm Beach County |
$1,254,604.00 |
$2,509,208.00 |
Old Bridge Park Natural Area |
PB-14-182 |
Palm Beach County |
$251,875.00 |
$503,750.00 |
Torry Island Reef Project |
PB-14-183 |
Palm Beach County |
$118,150.00 |
$236,300.00 |
Peanut Island Erosion Control & Reef Project |
PB-14-184 |
Palm Beach County |
$166,800.00 |
$333,600.00 |
West Palm Beach Living Shorelines |
PB-15-186 |
Palm Beach County |
$391,175.00 |
$782,350.00 |
Bert Winters Park - Phase IIA |
PB-15-188 |
Palm Beach County |
$1,000,000.00 |
$2,000,000.00 |
Burt Reynolds Park - Westside - Phase IIB |
PB-15-189 |
Palm Beach County |
$200,000.00 |
$400,000.00 |
Bert Winters Boat Ramp |
PB-89-5 |
Palm Beach County |
$71,500.00 |
$143,000.00 |
Dubois Park Restoration, Phase I |
PB-90-7 |
Palm Beach County |
$15,000.00 |
$30,000.00 |
Juno Park Improvements |
PB-90-8 |
Palm Beach County |
$12,500.00 |
$25,000.00 |
Ocean Inlet Marina Channel Dredging & Daymarking |
PB-91-12 |
Palm Beach County |
$60,000.00 |
$66,975.00 |
Munyon Island Restoration, Phase I |
PB-91-13 |
Palm Beach County |
$100,000.00 |
$202,000.00 |
Juno Beach Boat Ramp Improvement |
PB-92-18 |
Palm Beach County |
$60,354.00 |
$120,708.00 |
Burt Reynolds Park Boat Ramp Design |
PB-92-19 |
Palm Beach County |
$15,000.00 |
$30,000.00 |
Munyon Island Restoration Phase II |
PB-92-20 |
Palm Beach County |
$211,000.00 |
$442,000.00 |
Surveys For Munyon Island Restoration |
PB-93-26 |
Palm Beach County Board of Commissioners |
$21,704.00 |
$43,408.00 |
Burt Reynolds Park Boat Ramp & Parking |
PB-93-28 |
Palm Beach County Board of Commissioners |
$116,500.00 |
$400,000.00 |
Dubois Park Marina Phase I - Shoreline Stabilization |
PB-93-29 |
Palm Beach County |
$96,687.00 |
$222,380.00 |
Burt Reynolds Park Boat Ramp Construction & Improvement |
PB-94-33 |
Palm Beach County Board Commissioners |
$135,234.00 |
$270,468.00 |
Munyon Island Wetland Restoration - Phase II |
PB-94-34 |
Palm Beach County Board Commissioners |
$223,500.00 |
$1,170,083.00 |
Inshore Artificial Reef Project |
PB-95-37 |
Palm Beach County |
$73,687.00 |
$147,374.00 |
Peanut Island - Phase I Development |
PB-95-38 |
Palm Beach County |
$456,216.00 |
$912,433.00 |
Peanut Island Park & Phase 1 B & 2 A |
PB-96-44 |
Palm Beach County |
$399,050.00 |
$798,100.00 |
Red Reef Park Estuarine Enhancement |
PB-96-45 |
Palm Beach County D.E.R.M. |
$57,270.00 |
$114,540.00 |
Light Harbor Marina - Phase I |
PB-97-51 |
Palm Beach County |
EXPIRED |
EXPIRED |
Waterway Safety, Education & Enforcement |
PB-97-52 |
Palm Beach County Sheriff's Office |
$52,000.00 |
$61,400.00 |
Inshore Artificial Reef |
PB-97-53 |
Palm Beach County Board of Commissioners |
$50,000.00 |
$107,134.00 |
C.D. R.O.M. & Web Site For Lake Worth Lagoon |
PB-97-54 |
Palm Beach County |
$70,000.00 |
$92,000.00 |
Light Harbor Marina Construction |
PB-98-62 |
Palm Beach County |
EXPIRED |
EXPIRED |
Habitat Enhancement Along Lake Worth Golf Course |
PB-98-63 |
Palm Beach County |
$15,000.00 |
$30,000.00 |
Preconstruction Work Munyon Island Boat Dock |
PB-98-64 |
Palm Beach County |
EXPIRED |
EXPIRED |
Exotic Vegetation Removal & Environmental Restoration Project |
PB-99-74 |
Palm Beach County |
$5,250.00 |
$10,500.00 |
Inshore Artificial Reef Project |
PB-99-75 |
Palm Beach County |
$30,000.00 |
$60,000.00 |
Peanut Island Park - Phase III |
PB-99-76 |
Palm Beach County |
$97,500.00 |
$195,000.00 |
Boat Club Park Navigation Channel Dredging |
PB-BB-00-84 |
City of Boynton Beach |
$22,500.00 |
$25,000.00 |
Boat Club Park Navigation Channel Dredging |
PB-BB-02-97 |
City of Boynton Beach |
$18,000.00 |
$40,000.00 |
Boat Club Park Fishing/Viewing Pier |
PB-BB-03-105 |
City of Boynton Beach |
$22,430.00 |
$44,860.00 |
Jaycee Park Environmental Education |
PB-BB-09-136 |
City of Boynton Beach |
$77,045.00 |
$154,090.00 |
Boat Club Park Channel Maintenance Dredging |
PB-BB-91-14 |
City of Boynton Beach |
$80,000.00 |
$80,000.00 |
Mangrove Nature Preserve |
PB-BB-92-24 |
City of Boynton Beach |
$15,250.00 |
$30,500.00 |
Boynton Beach Downtown Mangrove Park |
PB-BB-94-36 |
City of Boynton Beach |
$195,000.00 |
$898,234.00 |
Safe Waterways |
PB-BB-98-71 |
City of Boynton Beach |
$51,670.00 |
$90,231.00 |
Okeechobee Waterway & Inland Marina Channels |
PB-BG-08-129 |
City of Belle Glade |
$480,500.00 |
$961,000.00 |
Okeechobee Waterway & Navigation Channels |
PB-BG-09-135 |
City of Belle Glade |
$328,770.00 |
$657,540.00 |
Restore Boardwalk, Navigation & Dockage - North Marina Basin - Phase I |
PB-BG-12-159 |
City of Belle Glade |
$29,000.00 |
$58,000.00 |
North Marina Basin Dock & Boardwalk - Phase II |
PB-BG-14-178 |
City of Belle Glade |
$434,000.00 |
$1,130,513.00 |
Pavilion Lake Ramp & Dredging - Phase I |
PB-BG-14-179 |
City of Belle Glade |
$32,500.00 |
$65,000.00 |
Belle Glade Marina Wharf Repairs |
PB-BG-87-1 |
City of Belle Glade |
CANCELED |
CANCELED |
Belle Glade Marina Seawall Const. |
PB-BG-87-2 |
City of Belle Glade |
CANCELED |
CANCELED |
Boat Ramp Parking Improvement - Belle Glade Marina |
PB-BG-92-22 |
City of Belle Glade |
$32,500.00 |
$65,000.00 |
Boca Raton Inlet Navigation Maintenance Program |
PB-BR-00-82 |
City of Boca Raton |
$100,000.00 |
$200,000.00 |
Inflatable Rescue Boat Safety Program |
PB-BR-00-83 |
City of Boca Raton |
$13,762.00 |
$18,350.00 |
Spanish River Police Dockage Facility |
PB-BR-02-96 |
City of Boca Raton |
$100,000.00 |
$200,000.00 |
Boca Raton Fire Rescue Boat |
PB-BR-03-104 |
City of Boca Raton |
$37,502.00 |
$75,004.00 |
Boca Raton Inlet Dredging Equipment |
PB-BR-12-160 |
City of Boca Raton |
$109,050.00 |
$218,100.00 |
Hillsboro Canal Maintenance Dredge - Phase I |
PB-BR-13-176 |
City of Boca Raton |
$75,000.00 |
$100,000.00 |
Hillsboro Canal Dredging - Phase II |
PB-BR-15-187 |
City of Boca Raton |
$412,500.00 |
$550,000.00 |
Lake Wyman Park Development |
PB-BR-88-4 |
City of Boca Raton |
$115,800.00 |
$231,600.00 |
Boating Safety |
PB-BR-96-48 |
City of Boca Raton |
$32,000.00 |
$56,572.75 |
Inlet Navigation & Sand Transfer Project |
PB-BR-97-57 |
City of Boca Raton |
$42,200.00 |
$404,487.00 |
Waterways Boating Safety Programs and Equipment |
PB-BR-98-66 |
City of Boca Raton |
$29,994.00 |
$54,994.00 |
Boca Raton Inlet Dredging Equipment |
PB-BR-98-67 |
City of Boca Raton |
$240,000.00 |
$546,000.00 |
El Rio Canal Dredging |
PB-BR-99-77 |
City of Boca Raton |
$23,052.00 |
$92,200.00 |
Police Boat |
PB-DB-00-85 |
City of Delray Beach |
$47,229.00 |
$62,974.00 |
Land Acquisition - Boat Ramp Parking |
PB-DB-00-86 |
City of Delray Beach |
$70,000.00 |
$140,000.00 |
Municipal Marina |
PB-DB-00-87 |
City of Delray Beach |
$81,000.00 |
$402,000.00 |
Seawall Parks |
PB-DB-02-98 |
City of Delray Beach |
$20,000.00 |
$40,000.00 |
Delray Intracoastal Park (MSA 650) |
PB-DB-06-117 |
City of Delray Beach |
$688,420.00 |
$1,376,840.00 |
Mangrove Park Boat Ramp Reconstruction |
PB-DB-10-144 |
City of Delray Beach |
$85,740.00 |
$175,000.00 |
Veterans Park - Phase I |
PB-DB-90-9 |
City of Delray Beach |
$157,500.00 |
$315,032.00 |
Seawall Rehabilitation Project |
PB-DB-94-35 |
City of Delray Beach |
$164,950.00 |
$408,900.00 |
Knowles Park Boat Ramp |
PB-DB-97-58 |
City of Delray Beach |
$77,261.00 |
$154,522.00 |
Delray Beach Marina Improvements |
PB-DR-88-3 |
City of Delray Beach |
$75,000.00 |
$150,000.00 |
Environmental Boating Education Program |
PB-JB-91-15 |
Town of Juno Beach |
$19,000.00 |
$19,000.00 |
Riverwalk - Phase II |
PB-JU-00-88 |
Town of Jupiter |
$500,000.00 |
$1,000,000.00 |
Water Safety Program |
PB-JU-00-89 |
Town of Jupiter |
$13,445.00 |
$17,926.00 |
Jupiter Riverwalk |
PB-JU-02-99 |
Town of Jupiter |
$500,000.00 |
$1,002,589.00 |
Bridge Park Plaza |
PB-JU-03-106 |
Town of Jupiter |
$246,250.00 |
$492,500.00 |
Make Our Waterways Safe |
PB-JU-06-118 |
Town of Jupiter |
WITHDRAWN |
WITHDRAWN |
Inlet Village Marina |
PB-JU-07-123 |
Town of Jupiter |
$200,000.00 |
$400,000.00 |
Riverwalk at Harborside |
PB-JU-09-137 |
Town of Jupiter |
$827,505.00 |
$1,655,010.00 |
Riverwalk at Harbourside - Phase B |
PB-JU-10-145 |
Town of Jupiter |
$700,000.00 |
$1,400,000.00 |
Jupiter Riverwalk & Public Docks at Jupiter Marina |
PB-JU-12-161 |
Town of Jupiter |
WITHDRAWN |
WITHDRAWN |
Safe Waterways |
PB-JU-96-43 |
Jupiter Police Department |
$35,598.00 |
$60,858.00 |
Jupiter Riverwalk - Phase I |
PB-JU-99-81 |
Town of Jupiter |
$429,025.00 |
$1,255,050.00 |
North Lake Park |
PB-LA-13-175 |
Town of Lantana |
$104,000.00 |
$208,000.00 |
Bicentennial Park |
PB-LA-92-25 |
Town of Lantana |
$57,000.00 |
$114,000.00 |
Sportsman's Park |
PB-LA-93-31 |
Town of Lantana |
$152,875.00 |
$340,750.00 |
Lantana Nature Preserve |
PB-LA-99-79 |
Town of Lantana |
$143,750.00 |
$495,000.00 |
Lake Park Marina Revitalization - Phase III |
PB-LP-00-91 |
Town of Lake Park |
$542,000.00 |
$1,145,000.00 |
Lake Park Marina Improvements - Phase IV |
PB-LP-01-93 |
Town of Lake Park |
$451,000.00 |
$902,000.00 |
Lake Shore Park Seawall Replacement |
PB-LP-04-109 |
Town of Lake Park |
$187,500.00 |
$375,000.00 |
Lake Shore Park Seawall Replacement |
PB-LP-07-124 |
Town of Lake Park |
$205,000.00 |
$410,000.00 |
Lake Park Harbor Marina Breakwater - Phase I |
PB-LP-08-130 |
Town of Lake Park |
WITHDRAWN |
WITHDRAWN |
Lake Park Harbor Marina Breakwater - Phase II |
PB-LP-09-138 |
Town of Lake Park |
WITHDRAWN |
WITHDRAWN |
Lake Park Harbor Marina Breakwater - Phase II |
PB-LP-13-174 |
Town of Lake Park |
WITHDRAWN |
WITHDRAWN |
Lake Park Municipal Marina Basin & Maintenance Dredging |
PB-LP-94-32 |
Town of Lake Park |
$67,803.00 |
$123,752.00 |
Lake Park Marina Revitalization - Phase I |
PB-LP-98-73 |
Town of Lake Park |
$150,000.00 |
$360,000.00 |
Lake Park Marina Improvements - Phase II |
PB-LP-99-80 |
Town of Lake Park |
$584,000.00 |
$1,168,000.00 |
Bryant Park Seawall Restoration - Phase A |
PB-LW-07-125 |
City of Lake Worth |
$802,007.00 |
$1,604,014.00 |
Bryant Park Boat Ramp Imp. & Bulkhead Repairs - Phase I |
PB-LW-95-39 |
City of Lake Worth |
$13,000.00 |
$26,000.00 |
Bryant Park Boat Ramp Improvements - Phase II |
PB-LW-96-42 |
City of Lake Worth |
$180,000.00 |
$360,000.00 |
Lakeside Park |
PB-NPB-06-119 |
Village of North Palm Beach |
$150,000.00 |
$300,000.00 |
Anchorage Park Improvements |
PB-NPB-08-131 |
Village of North Palm Beach |
$200,000.00 |
$700,000.00 |
Lakeside Park |
PB-NPB-90-11 |
Village of North Palm Beach |
$53,000.00 |
$106,000.00 |
Shoreline Protection Project - NPB Country Club |
PB-NPB-92-21 |
Village of North Palm Beach |
$24,400.00 |
$48,800.00 |
Shoreline Protection Program |
PB-NPB-95-41 |
Village of North Palm Beach |
$370,500.00 |
$741,000.00 |
Waterways Patrol and Vessel Program |
PB-NPB-98-70 |
Village of North Palm Beach |
$30,411.00 |
$44,078.00 |
Marina & Access Channel Dredging |
PB-PA-02-100 |
City of Pahokee |
$250,000.00 |
$500,000.00 |
Pahokee Marina/Channel Dredging |
PB-PA-04-112ER |
City of Pahokee |
$250,000.00 |
$350,000.00 |
Marine Reconstruction |
PB-PA-05-113 |
City of Pahokee |
$500,000.00 |
$2,707,000.00 |
Shoreline Stabilization & Marina Dredging |
PB-PA-06-120 |
City of Pahokee |
$425,000.00 |
$975,325.00 |
Route 2 Channel Markers |
PB-PA-11-156 |
Town of Pahokee |
EXPIRED |
EXPIRED |
Public Marina Wave Attenuator - Phase I |
PB-PA-11-157 |
Town of Pahokee |
EXPIRED |
EXPIRED |
Pahokee Marina and Park |
PB-PA-91-16 |
City of Pahokee |
$80,000.00 |
$195,000.00 |
Pahokee Marina Improvements |
PB-PA-96-46 |
City of Pahokee |
$30,000.00 |
$60,000.00 |
Pahokee Marina Improvements |
PB-PA-98-65 |
City of Pahokee |
$98,950.00 |
$197,900.00 |
Lake Worth Inlet Sand Transfer Plant Renovation |
PB-PB-09-139 |
Town of Palm Beach |
$300,000.00 |
$2,248,000.00 |
Town of Palm Beach Waterway - Phase I |
PB-PB-12-164 |
Town of Palm Beach |
$40,000.00 |
$80,000.00 |
Public Marina Dredging |
PB-PB-92-23 |
Town of Palm Beach |
$200,000.00 |
$250,000.00 |
Australian Dock Replacement & Expansion |
PB-PB-96-47 |
Town of Palm Beach |
$21,000.00 |
$105,000.00 |
Australian Dock Repl. & Expansion - Phase II |
PB-PB-97-56 |
Town of Palm Beach |
$382,000.00 |
$1,959,482.00 |
P.B. South Inlet Park Redevelopment - Phase I |
PB-PBS-02-102 |
Town of Palm Beach Shores |
$25,000.00 |
$50,000.00 |
Inlet Park Construction - Phase II & III |
PB-PBS-05-115 |
Town of Palm Beach Shores |
$150,000.00 |
$300,000.00 |
Palm Beach Maritime Museum Environmental Education. Program |
PB-PPB-93-27 |
Port of Palm Beach |
$60,000.00 |
$60,000.00 |
Docks For Environmental Education Project |
PB-PPB-97-59 |
Port of Palm Beach |
$69,521.00 |
$77,246.00 |
Municipal Marina Remediation - Phase I |
PB-RB-09-141 |
City of Riveria Beach |
$475,000.00 |
$950,000.00 |
Municipal Marina Construction |
PB-RB-10-150 |
City of Riviera Beach |
$850,000.00 |
$4,270,366.00 |
Municipal Marina Construction |
PB-RB-11-158 |
City of Riviera Beach |
$1,500,000.00 |
$3,500,000.00 |
Bicentennial Park Improvements - Phase I |
PB-RB-12-165 |
City of Riviera Beach |
$50,000.00 |
$100,000.00 |
Municipal Marina Construction - Phase B |
PB-RB-12-166 |
City of Riviera Beach |
$1,000,000.00 |
$3,399,000.00 |
Muncipal Marina Construction - Phase B1 |
PB-RB-13-177 |
City of Riviera Beach |
$750,000.00 |
$4,341,396.00 |
Riviera Beach Marina Construction - Part B, Phase I |
PB-RB-14-185 |
City of Riviera Beach |
$75,000.00 |
$150,000.00 |
Palm Beach Maritime Museum Environmental Education Program |
PB-RB-91-17 |
City of Riviera Beach |
EXPIRED |
EXPIRED |
Palm Beach Seaport Aquarium - Phase I |
PB-RB-96-49 |
City of Riviera Beach |
CANCELED |
CANCELED |
S.V. Florida, The Ship For Kids |
PB-RB-96-50 |
City of Riviera Beach & Living Classroom |
EXPIRED |
EXPIRED |
Riviera Beach Municipal Marina Dredging |
PB-RB-98-68 |
City of Riviera Beach |
$136,200.00 |
$152,000.00 |
Bicentennial Park & Boardwalk |
PB-RB-99-78 |
City of Riviera Beach |
EXPIRED |
EXPIRED |
Boat Ramp Park Expansion - Phase I |
PB-SB-02-103 |
City of South Bay |
EXPIRED |
EXPIRED |
I.C.W. Tributary Channel Improve. - Phase I |
PB-SB-98-72 |
City of South Bay |
EXPIRED |
EXPIRED |
Currie Park Boat Launching & Bulkhead Improve. |
PB-WPB-00-92 |
City of West Palm Beach |
$125,000.00 |
$255,000.00 |
West Palm Beach Waterfront Park - Phase I |
PB-WPB-04-111 |
City of West Palm Beach |
$250,000.00 |
$750,000.00 |
Waterfront Park - Phase II |
PB-WPB-05-116 |
City of West Palm Beach |
$1,000,000.00 |
$3,500,000.00 |
Waterfront Park - Phase III |
PB-WPB-06-122 |
City of West Palm Beach |
$1,000,000.00 |
$3,000,000.00 |
West Palm Beach Waterfront Park - Phase IV |
PB-WPB-07-128 |
City of West Palm Beach |
$1,000,000.00 |
$3,000,000.00 |
City Commons & Waterfront Park - Phase V |
PB-WPB-08-134 |
City of West Palm Beach |
$1,000,000.00 |
$2,000,000.00 |
City Commons & Waterfront Project - Phase V-2 |
PB-WPB-09-142 |
City of West Palm Beach |
$150,000.00 |
$300,000.00 |
Currie Park Boating Improvement |
PB-WPB-09-143 |
City of West Palm Beach |
$233,800.00 |
$467,600.00 |
City Commons Kayak/Paddle Boat Launch - Phase I |
PB-WPB-10-151 |
City of West Palm Beach |
$30,000.00 |
$60,000.00 |
Currie Park Fishing Piers Improvement Project |
PB-WPB-12-167 |
City of West Palm Beach |
$25,000.00 |
$50,000.00 |
Currie Park Boat Access Improvement Project - Phase I |
PB-WPB-12-168 |
City of West Palm Beach |
$394,000.00 |
$788,000.00 |
Currie Park Improvements - Phase I |
PB-WPB-89-6 |
City of West Palm Beach |
$91,750.00 |
$400,000.00 |
Currie Park - Phase II |
PB-WPB-90-10 |
City of West Palm Beach |
$100,000.00 |
$230,000.00 |
Renovation of Fishing Pier @ 54th Street Park |
PB-WPB-93-30 |
City of West Palm Beach |
$36,475.00 |
$72,950.00 |
Downtown Waterfront Park |
PB-WPB-95-40 |
City of West Palm Beach |
EXPIRED |
EXPIRED |
Docks For Environmental Education Project |
PB-WPB-97-61 |
City of West Palm Beach |
$135,882.00 |
$150,980.00 |
P.B. Maritime Museum Dock Extension & Building |
PB-WPB-98-69 |
City of West Palm Beach |
$137,550.00 |
$183,400.00 |
TOTALS |
$46,223,533.00 |
$136,737,461.75 |