Table 2. Summary of Historic Maintenance Dredging/Recent Shoaling
Intracoastal Waterway, Broward County, 1965-1996
| |
|
|
|
Design |
Pay** |
|
| ICWW Mileage |
Cut/Station |
Length |
|
Volume |
Volume |
Disposal |
| From |
To |
From |
To |
(ft) |
Year |
(cy) |
(cy) |
Area |
| 309.25 |
309.26 |
BW-1 / 0+58 |
BW-1 / 0+88 |
32 |
1996* |
175 |
209 |
|
| 309.52 |
309.65 |
BW-2 / 6+39 |
BW-2 / 12+98 |
660 |
1996* |
248 |
295 |
|
| 310.52 |
310.52 |
BW-5 / 16+71 |
BW-5 / 16+98 |
32 |
1996* |
204 |
243 |
|
| 310.77 |
310.83 |
BW-6 / 12+64 |
BW-6 / 15+57 |
296 |
1996* |
2,324 |
2,766 |
|
| 310.95 |
310.95 |
BW-6 / 22+25 |
BW-6 / 22+25 |
- |
1996* |
41 |
49 |
|
| 311.12 |
311.14 |
BW-7 / 3+25 |
BW-7 / 4+07 |
79 |
1996* |
572 |
681 |
|
| 311.26 |
311.34 |
BW-8 / 1+88 |
BW-8 / 6+24 |
433 |
1996* |
814 |
969 |
|
| 312.27 |
312.43 |
BW-11 / 16+80 |
BW-12 / 4+05 |
840 |
1996* |
1,823 |
2,170 |
|
| 312.62 |
312.85 |
BW-13 / 1+99 |
BW-15 / 0+74 |
1,246 |
1996* |
5,850 |
6,964 |
|
| 313.24 |
313.31 |
BW-17 / 3+31 |
BW-18 / 3+26 |
364 |
1996* |
2,453 |
2,921 |
|
| 313.49 |
313.72 |
BW-19 / 8+39 |
BW-20 / 8+87 |
1,209 |
1996* |
5,905 |
7,030 |
|
| 313.85 |
313.85 |
BW-21 / 6+59 |
BW-21 / 6+87 |
26 |
1996* |
136 |
162 |
|
| 313.92 |
313.94 |
BW-21 / 10+53 |
BW-21 / 11+85 |
132 |
1996* |
374 |
445 |
|
| 314.05 |
314.20 |
BW-22 / 3+45 |
BW-22 / 11+44 |
803 |
1996* |
2,341 |
2,787 |
|
| 314.33 |
314.48 |
BW-22 / 18+41 |
BW-22 / 20+96 |
253 |
1996* |
604 |
719 |
|
| 315.56 |
315.60 |
BW-23 / 53+50 |
BW-24 / 1+81 |
216 |
1996* |
814 |
969 |
|
| 316.36 |
316.43 |
BW-25 / 9+26 |
BW-25 / 12+92 |
370 |
1996* |
187 |
223 |
|
| 316.48 |
316.49 |
BW-25 / 15+57 |
BW-25 / 16+34 |
79 |
1996* |
183 |
218 |
|
| 316.54 |
316.61 |
BW-25 / 19+24 |
BW-25 / 22+42 |
322 |
1996* |
645 |
768 |
|
| 322.14 |
322.16 |
BW-35 / 8+32 |
BW-35 / 9+22 |
90 |
1996* |
238 |
284 |
|
| 322.98 |
323.00 |
BW-37 / 11+90 |
BW-37 / 12+95 |
106 |
1996* |
388 |
461 |
|
| 323.08 |
323.11 |
BW-38 / 1+59 |
BW-38 / 2+91 |
132 |
1996* |
409 |
487 |
|
| 323.77 |
323.77 |
BW-39 / 23+01 |
BW-39 / 23+29 |
26 |
1996* |
72 |
85 |
|
| 324.13 |
324.19 |
BW-42 / 1+58 |
BW-43 / 0+53 |
300 |
1996* |
96 |
114 |
|
| 331.48 |
331.48 |
BW-58 / 27+34 |
BW-58 / 27+34 |
- |
1996* |
41 |
49 |
|
| 331.80 |
331.81 |
BW-59 / 4+13 |
BW-59 / 4+69 |
58 |
1996* |
149 |
177 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Design Volume: |
27,086 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Pay Volume: |
32,245 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dredging Volume/Year: |
1,008 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50-Yr Dredging Requirement: |
50,383 |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
50-yr Disposal Requirement: |
108,323 |
|
|
| * Data from 1996 channel survey performed
by Sea Systems, Inc. for the Florida Inland Navigation District. |
| ** Numbers in italic are based on the
relationship: Pay Volume = 1.19 x
Design Volume |
|
|
|
|
|
|
|
|
|
|
|